Gnars DAO
Gnars DAOBase
Gnars DAO
Gnars DAOBase
  • TV
  • Dashboard
Gnars DAO
Gnars DAOBase

Nounish Open Source Action Sports Brand experiment.

Governance
  • Proposals
  • Create Proposal
  • Auctions
  • Treasury
Community
  • Members
  • Blogs
  • Propdates
  • Bounties
Explore
  • TV
  • Droposals
  • NogglesRails
  • Swap
  • Boards

© 2026 Gnars DAO · Built on Base

made with ⌐◨-◨

Proposal 121Pending

Noggles Rail #2 in Colombia for Low Park, Bogota, Suba

By
0x33bb...1563ea
For
0
Against
0
Abstain
0
Threshold
600 votes
Current threshold
Starts
May 27, 2026
10:14:57 PM UTC
Snapshot
#46,478,975
Taken at block
Description

Banner

NOGGLES RAIL COLOMBIA — BOGOTÁ PILOT
Public Skate Infrastructure Investment Proposal

  1. SUMMARY

Project: Permanent installation of the first Noggles Rail in Bogotá, capital of Colombia, as a pilot for the national public skate infrastructure circuit.

Location: Low Park Suba, Bogotá (northwest). DIY spot with 12 years of history, located between a public school and a residential complex, with high pedestrian and commercial foot traffic.

Objective: Build and install a skateable sculpture in the shape of Noggles (filled with concrete, sealed, painted, permanently anchored to the ground) that serves as public sports infrastructure, a local cultural activator, and a visibility vehicle for Gnars DAO.

Amount requested: 2,700 USD
Pilot duration: 6 weeks (construction + installation + inaugural event + impact report)

Return for Gnars: Permanent CC0 physical infrastructure, content repository, QR code with direct traffic to gnars.com, CC0 replicable model for the Latin American circuit.

WEEK 1: Module production.
WEEK 2: Weld and materials testing.
WEEK 3: Waterproofing & Painting.
WEEK 4: Installation at Low Park.
WEEK 5: Inaugural event.
WEEK 6: Audiovisual content delivery.


  1. LOCATION DESCRIPTION AND CONTEXT
VariableDetail
NameLow Park Suba
LocationMain avenue of the neighborhood, between a public school and a gated residential complex
SurroundingsParking lots, commercial establishments, high pedestrian traffic
History12 years as a DIY spot. Epicenter of skate culture in Suba and Bogotá
UsersChildren, youth, adults — continuous public use = Noggles rail is a public good.
ConditionOutdoors, permanent exposure to the elements. 2 years of paint.
RelevanceConsolidated community, spot validated by use, no new use permits required

by @DCOT15

  1. PRIOR VALIDATION PROCESS (COMPLETED)
StageStatusEvidence
Contact with local skaters✅ CompletedContact list and meeting minutes
Presentation of the Gnars/Noggles Rail project✅ In progressSocialization minutes
Technical site visit✅ CompletedPhotographs, measurements, location plan
Local community approval✅ CompletedCommunity approval document
Supplier selection✅ CompletedThe quote was made based on quality and experience and is the selected one: Velasco Soluciones — They have more than 11 years of experience providing all types of metallurgical solutions for outdoors and interiors. They will deliver every detail so that another workshop anywhere in the world can replicate it — CC0 technical recipe.
Design definition adapted to community request✅ Measurements and location definedTechnical plans adjusted to park dimensions
Budget and execution timeline agreed✅ Can fabricate multiple modules simultaneously4 weeks (3 assembly + 1 painting). Option for 2 simultaneous modules
  1. PILOT SCOPE (PHASE 1 — ONLY PHASE FUNDED IN THIS PROPOSAL)
    Guiding principle: Infrastructure first, then outreach. This proposal exclusively funds the construction, installation, and validation of the first module. Mass content production and the multi-city circuit are post-pilot, subject to success metrics.

4.1 Concrete Deliverables (Phase 1)

IDDeliverableTechnical specificationVerification
E1Noggles Rail module builtWelded metal structure, filled with concrete, waterproofed, weather-resistant paint, Noggles-style finishProcess photos + load test video
E2Permanent installation at Low ParkGround anchoring by welding to a steel plate embedded in a concrete foundation. Fixed to the park.Geotagged photos + community handover document
E3Physical QR code on the moduleLaminated/weather-resistant QR code directing to nogglesrail.gnars.comPhoto of installed QR + redirect test
E4CC0 documentation publishedTechnical "recipe" in Spanish: materials, measurements, cutting, welding, assembly, testing, waterproofing, painting, permanent installationPublished in repository designated by Gnars
E5Inaugural event1 day. Local competition/friendly session. Award of 2 skateboards as prizes. Community and local media presenceAttendance list + photos/video
E6Initial impact reportMetrics: estimated daily users, social media engagement, QR traffic, testimonialsDocument delivered to Gnars 4 weeks post-installation

4.2 Explicit exclusions from this phase
Dedicated social media accounts are not funded (existing proposer/Gnars channels will be used)
Additional merch or large-scale professional audiovisual production is not funded (only technical documentation and event recording with own equipment)
Expansion to other cities is not funded (this requires a separate proposal post-evaluation)

ConceptUSD%Justification
Module construction (materials, cutting, welding, concrete, waterproofing, painting)1,80066.7%Fixed quote with Velasco Soluciones. 4 weeks.
Transport (workshop → Low Park)1003.7%Distance within Bogotá, cargo vehicle
On-site installation (foundation, anchoring, final welding)1003.7%Specialized labor, 1 day
Inaugural event (basic logistics, sound, neighborhood permits)1003.7%Community event, not a festival
Prizes (2 skateboards)1003.7%Incentive for inaugural participation
Management, planning and supervision2007.4%Technical coordination, construction follow-up, deliverable validation
Technical documentation and audiovisual recording30011.1%Process photography, technical installation video, event video, basic editing, CC0 publication
TOTAL2,700100%
  1. EXECUTION TIMELINE
WeekActivityResponsibleVerifiable deliverableDisbursed budget
W1Final design + Gnars approval + materials purchase orderProposerSigned purchase order, approved final plans900 USD (50% construction)
W2Cutting and assembly of metal structureVelasco SolucionesProcess photos on day 3 and 7—
W3Concrete fill, curing, waterproofingVelasco SolucionesCuring photos, structural test video900 USD (50% construction + transport)
W4Final paint, Noggles finish, QR preparationVelasco Soluciones + ProposerFinish photos, QR generated and tested100 USD (installation)
W5Transport and permanent installation at Low ParkVelasco Soluciones + ProposerGeotagged photos, signed community handover document100 USD (event)
W6Inaugural event + prize delivery + audiovisual recordingProposer + local communityAttendance list, edited event video, photos200 USD (management) + 300 USD (documentation)
W7-W8CC0 documentation publication, initial impact report, evaluationProposerTechnical document published, metrics report delivered to Gnars—
  1. ACCOUNTABILITY AND GOVERNANCE FRAMEWORK

7.1 Responsible parties structure

RolePerson/EntityFunction
Lead executorDaniel Camilo Osorio TGeneral coordination, Gnars interface, construction supervision, report delivery
Construction providerVelasco Soluciones, Daniel VelascoModule fabrication and installation. Contract with technical specifications
Community validatorLocal skaters from Low Park — Raton, James AriasLocation approval, module testing, handover document
DAO counterpartGnars DAO D.C.O.T. fuzzyface.ethMilestone disbursement approval, deliverable reception, go/no-go decision for expansion

7.2 Milestone-conditioned disbursements

MilestoneCondition for disbursementAmount
M1Proposal approval + signed purchase order900 USD
M2Photo/video evidence of assembled and concreted structure900 USD
M3Installation completed + community handover document300 USD
M4Event held + CC0 technical documentation published + initial report delivered600 USD

7.3 Verification methods
Geotagged photography: All construction photos carry GPS metadata and date.
Process video: Minimum 3 minutes showing cutting, assembly, concreting, painting, installation.
Signed community document: Scanned physical document with signatures from 3+ representative local skaters.
QR test: Screenshot of successful redirect from the physical module.
CC0 publication: Verifiable link in a publicly accessible repository.
Impact report: Standard document with quantitative and qualitative metrics.

7.4 Success and failure thresholds

IndicatorSuccess threshold (4 weeks post-installation)Failure thresholdAction if failure is reached
UsageMinimum 15 active users/day observed or reported<5 users/dayEvaluate relocation or design adjustment
QR engagement>50 scans in 30 days<10 scansReview QR visibility/placement
Generated content>10 pieces of organic content (photos/videos) published by users0 piecesActivate community incentive strategy
Physical integrityNo major structural damageDamage that prevents safe useConstruction warranty: Velasco Soluciones repairs at no additional cost (contractually agreed)
Community satisfaction>70% of local skaters satisfied (simple survey)<50% satisfiedAdjustment meeting with community
  1. RETURN ON INVESTMENT FOR GNARS (NON-FINANCIAL ROI)
CategorySpecific deliverableValue for Gnars
Infrastructure1 permanent Noggles Rail in the capital of ColombiaPhysical public asset with Gnars branding visible 24/7
ContentCC0 repository of photos, technical videos, construction "recipe"Reusable material for global marketing, reduction of future production costs
TrafficPhysical QR → gnars.com/nogglesrailOrganic, measurable user acquisition channel
ModelPilot documentation with real metricsInvestment dossier for future sponsors or expansions
NetworkActivation of the Bogotá skate communityLocal ambassadors for future Gnars initiatives in LATAM
ExpansionNational/Latin American circuit optionIf pilot meets success thresholds, Phase 2 proposal with concrete data
  1. RISKS AND MITIGATION
RiskProbabilityImpactMitigation
Construction delayMediumMediumContract with delay penalty; buffer weeks in timeline
Vandalism or theft of moduleLowHighPermanent ground anchoring (welded + concreted), location in high-traffic area (natural deterrent)
Low user adoptionLowMediumSpot validated by 12 years of use; design co-created with local skaters
Municipal permitsMediumHighLow Park is a consolidated public-use space; no special permit required for urban sports furniture (validated)
Provider non-complianceLowHighContract with technical specifications; milestone payments; 6-month warranty
  1. NEXT PHASES (POST-PILOT, NOT FUNDED HERE)
PhaseDescriptionActivation conditionEstimated budget
Phase 2Second module in another Colombian city (Medellín, Cali or Barranquilla)Bogotá pilot meets 3/5 success thresholds2,500–3,000 USD
Phase 3National circuit (4–6 cities) + professional audiovisual production3 modules installed with positive metrics15,000–20,000 USD
Phase 4Latin American expansion (Mexico, Argentina, Brazil)Validated national circuit + local alliancesTo be defined
  1. SUGGESTED ANNEXES (TO INCLUDE IN FINAL SUBMISSION)
    Photographs of Low Park and measurements

Technical plans of the adapted module attached with CC0 production technical recipe
Contract or letter of intent with Velasco Soluciones for the production and installation of the Lowpark Module + Community approval document filmed on video installation
Noggles rail Colombia Instagram social network promotion open.


BOGOTÁ
Location visit

Captura de pantalla 2026-05-09 113318

image

Design and location approved by the community

Captura de pantalla 2026-05-09 113622

Velasco Soluciones.
Meeting

image

Facilities.

Captura de pantalla 2026-05-25 165554

Location map Low Park Suba:

https://www.google.com/maps/place/Low+Park+Skatepark/@4.7440431,-74.1117005,3a,75y,90t/data=!3m8!1e5!3m6!1sCIHM0ogKEICAgMCArIXyUg!2e10!3e10!6shttps:%2F%2Flh3.googleusercontent.com%2Fgps-cs-s%2FAPNQkAG5zjefEsn8cVpwQ4jKJK5ECYgOs7VSkC7NIc6nzVnXPSEJXZ4JH0vWtkTUqV9qRxx6Z_Atp6OuPGyytEX-g94aLFdnORnwV91xDwqrnSekYwPyU9V22uW2aMw_ixI3aXJ6S1YJ%3Dw203-h360-k-no!7i720!8i1280!4m13!1m2!2m1!1slow+park+bogota!3m9!1s0x8e3f84889bcd5285:0x3d07b320286985f4!8m2!3d4.7440431!4d-74.1117005!10e5!14m1!1BCgIgARICCAQ!15sCg9sb3cgcGFyayBib2dvdGFaESIPbG93IHBhcmsgYm9nb3RhkgEDZ3ltmgEkQ2hkRFNVaE5NRzluUzBWSlEwRm5TVVI0TW5aeFozcFJSUkFC4AEA-gEECAAQIA!16s%2Fg%2F11cn7ynt7g?entry=ttu&g_ep=EgoyMDI2MDUyMC4wIKXMDSoASAFQAw%3D%3D

Instagram of the spot: https://www.instagram.com/lowparksb/

This project is planned to begin construction as soon as the proposal is approved, with intentions to hold the inauguration on June 21st, Skate Day. According to the 4-week timeline, we would be within the time frame to set in motion this vision of building a Noggles Rail circuit in Colombia.

Proposed Transactions

Tx #1

Send USDC

From

DAO Treasury

0x72ad...6f88

2700 USDC

To

330x33bb...1563ea

Token Contract

0x833589...bda02913